Business.gov.nl uses cookies to improve the website. These functional and analytical cookies do not contain your personal data. Do you want to watch video content? Third parties may place tracking cookies to track your online behaviour. You can refuse these tracking cookies. How cookies are used on Business.gov.nl.

Permit or exemption for provincial waterway structures

Province Groningen: Permit or exemption for provincial waterway structures

Published by:
Province Groningen
Checked 28 Feb 2024
< 1 min read
Nederlandse versie

A business must obtain prior authorisation if it intends to carry out activities that adversely affect the environment. Examples are wind farms, sewage treatment, waste management and storage, soil or spoil dredging and for geothermal generation. The province then carries out a limited environmental assessment. If approved, you receive a simple environmental permit, without prescriptions.

You should consult with the province. Approval for the OBM is requested via Omgevingsloket online. You can carry out the permit check in the loket. You will then immediately see whether you need a permit, need to make a report or neither.

Apply

The environmental assessment applies if: 1. an EIA is required (EIA = environmental impact assessment) and for: wind farms, large sewage treatment plants, breweries, livestock farms; 2. the province must assess whether the activity fits local conditions, such as: waste activities – waste is managed effectively, installing closed geothermal energy systems (for geothermal generation) in what are called interferentiegebieden (interference areas), where these systems can interfere with one another, cement and concrete plants, fermentation of animal manure.

For the EIA: the omgevingsvergunning beperkte milieutoets – OBM (environmental permit: limited environmental impact assessment) will be issued only if the EIA assessment shows that no subsequent EIA is required. The province can then issue you with an OBM, for which you should follow the normal procedure. Does an EIA have to be drawn up? You can then apply for an ordinary environmental permit. To do so, you should follow the extended procedure.

This webpage is part of an EU quality network

How would you rate this page?(question 1 of max 3)
We are sorry to hear that. How can we improve?(question 2 of 3)

Questions relating to this article?

Please contact the Province Groningen