Subsidy for private charging stations (SPRILA)
The Private Charging Infrastructure at Businesses Subsidy Scheme (SPRILA) is for entrepreneurs who want to have charging infrastructure on their premises or get advice on it. Charging infrastructure consists of a network of charging points, such as charging stations, for electric vehicles.
With SPRILA Purchase (SPRILA Aanschaf), you can apply for a subsidy for the construction of charging infrastructure on your premises. Would you like advice on building charging infrastructure on your premises? With SPRILA Advice (SPRILA Advies), you can apply for a subsidy for the consultancy costs.
Your charging location, such as a car park or parking lot, where the charging infrastructure is to be installed, must be privately accessible. Privately accessible means that the site is only available to you, your employees, or your visitors at certain times.
If you want to build charging infrastructure for heavy vehicles in a publicly accessible location, you can apply for SPULA subsidy.
When are you eligible for SPRILA Purchase?
To apply for the SPRILA Purchase subsidy you must meet the following conditions:
- You are registered with the Dutch Chamber of Commerce (KVK). Your company is based in the Netherlands.
- You build the charging infrastructure on your own premises or on premises you rent.
The charging infrastructure must also meet several requirements. It must consist of the basic charging infrastructure, including the main connection and cabling, in combination with:
- one or more AC charging stations with a minimum capacity of 11 kW, and with at least 4 charging points
- one or more AC charging stations with a minimum capacity of 43 kW
- one or more DC charging stations with a minimum capacity of 20 kW, and with at least one charge point
Find out all requirements for the charging infrastructure (in Dutch).
When are you eligible for SPRILA Advice?
To apply for the SPRILA Advice subsidy you must meet the following conditions:
- You are an entrepreneur, a group of entrepreneurs (partnership), or you are a public transport concession holder.
- You are registered with the Dutch Chamber of Commerce (KVK).
- You are established in the Netherlands.
- You need advice on charging infrastructure on your own premises, premises you share with other entrepreneurs, or on premises you rent.
- An external consultant will draw up the advice. They do not work for your company or group.
The advice must be drawn up after 1 April 2024. It must also include several subjects, among other things:
- expected investment costs of the charging infrastructure
- possible charging locations
- type of charging station
Check the full list of subjects the advice must include (in Dutch).
How to apply
You can apply for charging infrastructure subsidies from 24 September 2024, 09:00 until 31 December 2024, 12:00 to the Netherlands Enterprise Agency (RVO).
SPRILA Purchase application
Do you want to apply for the SPRILA Purchase subsidy (in Dutch) and is the subsidy amount lower than €25,000? Then the charging infrastructure must be built before you apply for the subsidy. After the work is completed, you have 13 weeks to complete the application. Is the subsidy amount higher than € 25,000? Then you apply for the subsidy before you commission the charging infrastructure.
Use RVO's calculation tool (in Dutch) to determine whether you are eligible for more or less than €25,000 in subsidies.
You will need to supply several documents with your application, for example a quotation or invoice showing brand, type, specifications, and installation costs of the charging stations. Check which documents you need to apply for SPRILA Purchase (in Dutch).
SPRILA Advice application
You can only apply for the SPRILA Advice subsidy (in Dutch) after you have received the advice. You will need to supply several documents with your application, such as the invoice for the advice and the proof of payment. Check which documents you need to prepare your application for SPRILA Advice (in Dutch).
This article is related to:
Related articles
Questions relating to this article?
Please contact the Netherlands Enterprise Agency, RVO